{"id":2947,"date":"2022-06-20T17:50:52","date_gmt":"2022-06-20T12:20:52","guid":{"rendered":"https:\/\/www.propertyxpo.com\/blog\/?p=2947"},"modified":"2022-06-20T17:51:16","modified_gmt":"2022-06-20T12:21:16","slug":"noida-international-airport-to-be-built-by-tata-projects","status":"publish","type":"post","link":"https:\/\/www.propertyxpo.com\/blog\/noida-international-airport-to-be-built-by-tata-projects\/","title":{"rendered":"NOIDA INTERNATIONAL AIRPORT TO BE BUILT BY TATA PROJECTS"},"content":{"rendered":"<p><span style=\"font-weight: 400\"><a href=\"https:\/\/www.tataprojects.com\/\">Tata Projects<\/a> has been selected by <\/span><span style=\"font-weight: 400\">Yamuna International Airport Private Limited (YIAPL) for the engineering, procurement and construction (EPC) of the <a href=\"https:\/\/www.propertyxpo.com\/blog\/noida-international-airport-to-be-built-by-tata-projects\/\"><em><strong>Noida International Airport<\/strong><\/em><\/a> (NIA). Runway, terminals, airside infrastructure, landside facilities, and other buildings will be built by the developer. The company has beaten Shapoorji, Larsen and Toubro<\/span><span style=\"font-weight: 400\">\u00a0in bagging this contract.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">The first phase is expected to get completed in two years, as the airport is supposed to be ready by 2024. The airport is being developed as a public-private partnership between Zurich Airports and Uttar Pradesh Government. An investment of Rs. 5,700 crores for phase 1 and a tie-up of around Rs. 3,725 crores as debt with State Bank of India for the project has been made by Zurich Airport.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-2949\" src=\"https:\/\/www.propertyxpo.com\/blog\/wp-content\/uploads\/2022\/06\/thequint_2021-11_e7efd62b-e43f-44b6-968f-7a122b24f815_25111_pti11_25_2021_000162b.jpg\" alt=\"noida international aiport\" width=\"3947\" height=\"2220\" srcset=\"https:\/\/www.propertyxpo.com\/blog\/wp-content\/uploads\/2022\/06\/thequint_2021-11_e7efd62b-e43f-44b6-968f-7a122b24f815_25111_pti11_25_2021_000162b.jpg 3947w, https:\/\/www.propertyxpo.com\/blog\/wp-content\/uploads\/2022\/06\/thequint_2021-11_e7efd62b-e43f-44b6-968f-7a122b24f815_25111_pti11_25_2021_000162b-768x432.jpg 768w\" sizes=\"auto, (max-width: 3947px) 100vw, 3947px\" \/><\/p>\n<p><span style=\"font-weight: 400\">The Noida International Airport will be a digital airport, having facilities like contactless travel, personalised services for families, efficient passenger flow all of this while being environmentally responsible by keeping its commitment to minimise impact on ecology.<\/span><\/p>\n<h2>For More Information<\/h2>\n<p><a href=\"https:\/\/www.propertyxpo.com\/\"><em><strong>https:\/\/www.propertyxpo.com\/<\/strong><\/em><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tata Projects has been selected by Yamuna International Airport Private Limited (YIAPL) for the engineering, procurement and construction (EPC) of the Noida International Airport (NIA). Runway, terminals, airside infrastructure, landside facilities, and other buildings will be built by the developer. The company has beaten Shapoorji, Larsen and Toubro\u00a0in bagging this contract.\u00a0 The first phase is expected to get completed in two years, as the airport is supposed to be ready by 2024. The airport is being developed as a public-private <a href=\"https:\/\/www.propertyxpo.com\/blog\/noida-international-airport-to-be-built-by-tata-projects\/\" class=\"read-more button-fancy -red\"><span class=\"btn-arrow\"><\/span><span class=\"twp-read-more text\">Continue Reading<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":2948,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2947","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/posts\/2947","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/comments?post=2947"}],"version-history":[{"count":2,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/posts\/2947\/revisions"}],"predecessor-version":[{"id":2951,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/posts\/2947\/revisions\/2951"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/media\/2948"}],"wp:attachment":[{"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/media?parent=2947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/categories?post=2947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.propertyxpo.com\/blog\/wp-json\/wp\/v2\/tags?post=2947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}